Greenbyte Ideas
Our approach to product feedback
The benefits of giving us your product feedback
What happens to your product feedback
How we choose what to implement
- Customer feedback - there are many ways we listen for your feedback:formal customer interviews and other research activitiesevents like conferences and trade showscomments and votes on issues here in Greenbyte & BluePoint Influence
- CSM team insights - our CSM team knows which issues are the most challenging and most common for customers.
- Product analytics - we track how users move through the system, which helps us understand how existing features are being used.
- Product strategy - our long-term strategic vision for the products.
Custom applications
273 results found
-
Tariffs
We would like to set up the tariff (€) to have a complete overview of our budget
13 votes -
Display totals in Status logs
In Status Categorization,
1- why don't you display the losses together with the downtimes for each line?
2- then could you display the total of losses and downtimes for what is on display (and thus filtered)?
It could be very useful so to know the total of losses and downtimes for a specific downtime code by example, or any other filtered downtimes8 votes -
add extra information icon available to status code
I would be usefull to include an extra icon displaying a pop-up with extra information on a certainstatus code. This would improveinterpretation of certain status codes that only appear very limted.
This would involve also creating an extra information field to the status code overview under administrate/contract/status code
7 votes -
Keeping the track of snag list
We would like to be able to keep the track of snag list per turbine or per site(i.e. missing parts, malfunctioning equipment etc.); things that are not part of mainly HSE, but worth keeping as part of the records.
7 votes -
Harmonize date/time selectors throughout the system
There are inconsistencies in both the options for quick time selectors (Last 7 days - Last week - etc.) as well as the label used for date/time fields (time span - time interval - during - etc.). Also - in some places you are given a single calendar to select both the start and end date - and in others these are separate calendars.
We would like to harmonize the date/time selectors throughout the system to make them consistent.
Proposed quick selections
All time
Last year
This year
Last month
This month
Last week
This week
Last 7 days
Yesterday…29 votes -
Hide or remove widget informations
We would like to be able to choose which information we want to hide or display on the widgets.
For example, for the "Real-Time Wind Turbine Metrics" widget we do not want to display the column of the icon and the ID.10 votes -
Select Availability Category Within Task
When creating a task there is an option that may be selected that is labeled "Affects Downtime". If this option is enabled, the availability contract categories should appear and one should be assigned to the task.
This would be useful for sites that are utilizing tasks to coordinate site work.
8 votes -
Be able to generate an audit trail of users switching work parties
Sometimes, technicians have to leave a work party on a turbine and work with another work party on a different turbine. If we add their name onto the new work party, there is no way in the future we can track the fact that he/she was working with another work party previously. Could we have a tracker that indicates which work parties a user has been associated with in a day?
6 votes -
Plan | Task | Lost production for a task
The sum of the lost production of status codes attachted to a specific task. There are multiply status codes connected to a task. When I want to calculate the lost production I have to open every status code and look for the lost production. It would be nice - if there is a lost production for a task.
15 votes -
Tasks: for several tasks linked to site access, select only the ones you want to resolve
When there are several tasks in a site access , I need to be able to to choose the one you want to resolve and the one you want to let unresolved
8 votes -
Have name of operation controller in site access
Have the name of the operation controller in the site access (actually it is a WTSR requirement)
7 votes -
Automatically add current time as start time when logging on additional personnel to an existing "Site Access"
When logging on additional personnel to an existing "Site Access", currently you must manually enter the start time for each new person. Instead the Start Time should automatically populate with the current time (i.e. the same way it does when you first create a "Site Access"). This is another time sink that could be easily eliminated.
7 votes -
Monthly estimated budget
We would like to have a monthly estimated budget taking into account the energy already exported and planned downtimes.
This value would be updated every day and displayed in kWh and €.
6 votes -
Add comments when task is created
Make it possible to add a comment from the create task window. Right now you have to create a task - wait for page to refresh - and than add a comment - this workflow is taking to much time.
15 votes -
Export data: add the option to edit existing exports
Right now if a wrong setting is made in the export, the export must be done all over again. Adding an "edit"-Button to exports would solve this. It would also be helpful for recurring exports when the old export could be edited instead of using the template function.
5 votes -
Export User Defined Alerts
We do want to track how frequent specific alarms ( especially user defined ones) are repeating.
5 votes -
Lost production : manual recording possibility
In case of grid loss -for example- - the lost production of a status log can be calculated with the Estimated Potential Power. But this considers only a short period of time (mean between one hour before and one hour after the shutdown). When the shutdown is for a long time period (several hours or days) - it would be useful that the users could add a lost production manually.
6 votes -
Plan - Tasks - Mass edit tasks
Enable mass edit on the task list with the following options:
Resolve
Delete22 votes -
Expiry date on Personnel qualifications
Put expiry dates on qualifications as per inductions. For example Authorised technician status. These qualifications are only valid for a period of time before they have to be renewed. At present there is a HSE risk that someones qualification could expire and they could take control / device access of an asset they are no longer authorised to work on. When the qualification expires then it is removed from the persons record as per the inductions meaning that they cannot take out a device access as they don't have the qualification needed. In addition to this add another field for…
24 votes -
Automatic periodic report issuing
Automatically send reports periodically (once per month - quarter) using a predefined template to a specified group of emails.
16 votes