Greenbyte Ideas
Our approach to product feedback
The benefits of giving us your product feedback
What happens to your product feedback
How we choose what to implement
- Customer feedback - there are many ways we listen for your feedback:formal customer interviews and other research activitiesevents like conferences and trade showscomments and votes on issues here in Greenbyte & BluePoint Influence
- CSM team insights - our CSM team knows which issues are the most challenging and most common for customers.
- Product analytics - we track how users move through the system, which helps us understand how existing features are being used.
- Product strategy - our long-term strategic vision for the products.
Custom applications
273 results found
-
Keeping the track of snag list
We would like to be able to keep the track of snag list per turbine or per site(i.e. missing parts, malfunctioning equipment etc.); things that are not part of mainly HSE, but worth keeping as part of the records.
7 votes -
Make it possible to sort columns in Status Categorization
I want to be able to arrange the downtimes by duration, WTG, start time, end time, category, code, comment, etc.
38 votes -
Select Availability Category Within Task
When creating a task there is an option that may be selected that is labeled "Affects Downtime". If this option is enabled, the availability contract categories should appear and one should be assigned to the task.
This would be useful for sites that are utilizing tasks to coordinate site work.
8 votes -
Mass Resolve HSE incidents
When you add a HSE incident to devices, it is easy to mass add them.
However, when it comes to resolving the HSE incidents, this has to be done individually which can be very time consuming, especially on a large site.12 votes -
Export data: add the option to edit existing exports
Right now if a wrong setting is made in the export, the export must be done all over again. Adding an "edit"-Button to exports would solve this. It would also be helpful for recurring exports when the old export could be edited instead of using the template function.
5 votes -
Have name of operation controller in site access
Have the name of the operation controller in the site access (actually it is a WTSR requirement)
7 votes -
Comments to tasks from site access
At site access log-off > be able to add comments to the task
29 votes -
Tasks: for several tasks linked to site access, select only the ones you want to resolve
When there are several tasks in a site access , I need to be able to to choose the one you want to resolve and the one you want to let unresolved
8 votes -
Hide or remove widget informations
We would like to be able to choose which information we want to hide or display on the widgets.
For example, for the "Real-Time Wind Turbine Metrics" widget we do not want to display the column of the icon and the ID.10 votes -
Monthly estimated budget
We would like to have a monthly estimated budget taking into account the energy already exported and planned downtimes.
This value would be updated every day and displayed in kWh and €.
6 votes -
Export User Defined Alerts
We do want to track how frequent specific alarms ( especially user defined ones) are repeating.
5 votes -
Automatically add current time as start time when logging on additional personnel to an existing "Site Access"
When logging on additional personnel to an existing "Site Access", currently you must manually enter the start time for each new person. Instead the Start Time should automatically populate with the current time (i.e. the same way it does when you first create a "Site Access"). This is another time sink that could be easily eliminated.
7 votes -
Tariffs
We would like to set up the tariff (€) to have a complete overview of our budget
13 votes -
Plan | Task | Lost production for a task
The sum of the lost production of status codes attachted to a specific task. There are multiply status codes connected to a task. When I want to calculate the lost production I have to open every status code and look for the lost production. It would be nice - if there is a lost production for a task.
15 votes -
Lost production : manual recording possibility
In case of grid loss -for example- - the lost production of a status log can be calculated with the Estimated Potential Power. But this considers only a short period of time (mean between one hour before and one hour after the shutdown). When the shutdown is for a long time period (several hours or days) - it would be useful that the users could add a lost production manually.
6 votes -
Harmonize date/time selectors throughout the system
There are inconsistencies in both the options for quick time selectors (Last 7 days - Last week - etc.) as well as the label used for date/time fields (time span - time interval - during - etc.). Also - in some places you are given a single calendar to select both the start and end date - and in others these are separate calendars.
We would like to harmonize the date/time selectors throughout the system to make them consistent.
Proposed quick selections
All time
Last year
This year
Last month
This month
Last week
This week
Last 7 days
Yesterday…29 votes -
Add comments when task is created
Make it possible to add a comment from the create task window. Right now you have to create a task - wait for page to refresh - and than add a comment - this workflow is taking to much time.
15 votes -
Add additional equations for calculating Energetic Availability based on specific OEM contracts
It would be extremely useful to be able to create custom availability contracts that use different methods for calculating lost production and energetic availability.
8 votes -
Plan - Tasks - Mass edit tasks
Enable mass edit on the task list with the following options:
Resolve
Delete22 votes -
Resolve Task Through Comment
There should be a toggle to resolve/unresolve a task from the add comment window - similar to the resolve task function found when logging site access.
11 votes
- Don't see your idea?