  1. Site maintenance schedule

    Have a maintenance schedule for sites with an alert system for overdue works.

    • Security Alarm inspections
    • CCTV inspections
    • Fire Alarm inspections
    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  2. Have a maintenance schedule tracker for turbines

    Have a maintenance schedule for the turbines with an alert system for overdue works.

    • Annual maintenance
    • Semi-annual maintenance
    • Blade inspection
    • HV inspections
    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. conditional powercurve

    For conditional power curves it would be nice to have the following options:
    1. copy the default values to conditonal power curve for editing, that saves time entering the values manually.
    2. it would be nice to add a condition: to be able to give a start date + time and end date + time. Currently if curtailment starts at 10:00 at day 1 and ends at 16:00 at day 5 it requires you to manually enter the conditional power curve 3 times!

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. Site time should match SCADA time during summer months (not just in winter!)

    In summer when Australia/Melbourne shifts to Australian Eastern Daylight Time (AEDT = UTC+11) 'Site time' does not match the Vestas wind turbines which always follow Australian Eastern Standard Time (AEST = UTC+10). It would be preferable for the Site time to always match the SCADA data. Thanks!

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Target availability on Wind Farm level

    We have a target availability on the Wind Farm and on the Wind Turbine level. It would have been better to have both as the target is not accurate when using only wind turbine level in our case.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  6. Audit trail of comments in the comments section in portfolio page

    Currently, we can only see one comment against the stop and it is often the latest update on the stop. To see a history of work undertaken to bring the turbine back online, it would be useful to have an audit trail of comments that can be saved somewhere in the back end. That basically means that when we use APIs to export the comments in status logs it only pulls the latest comment- like it does now but there should still be a provision to view the history of comments including user, date and time elsewhere in GEC.

    5 votes