Lost production : manual recording possibility
In case of grid loss -for example- - the lost production of a status log can be calculated with the Estimated Potential Power. But this considers only a short period of time (mean between one hour before and one hour after the shutdown). When the shutdown is for a long time period (several hours or days) - it would be useful that the users could add a lost production manually.
6
votes
Hélène COUTAND
shared this idea