Middle voltage loss calculation (Energy Export vs. Energy Meter) in MWh or %
When metering systems are connected to the Scada one standardized tech. KPI is to understand the middle voltage losses between WTGs and official energy metering.
Ideally such should be calculated on kWh/MWh basis as simple delta between Sum of Energy Export (WTGs) and official Metering. Additionally the % deviation should be calculated, too.
Further benefits:
As Greenbyte introduced the Loss Waterfall also this calculation would benefit from the above as additional losses (depending the size of the wind farm typically 0.5 - 2.x %) could be highlighted. Additional precision for the Loss Waterfall Diagram!
Thanks for your feedback, this is a great request. It's open for voting from other users.