Greenbyte Ideas
Our approach to product feedback
The benefits of giving us your product feedback
What happens to your product feedback
How we choose what to implement
- Customer feedback - there are many ways we listen for your feedback:formal customer interviews and other research activitiesevents like conferences and trade showscomments and votes on issues here in Greenbyte & BluePoint Influence
- CSM team insights - our CSM team knows which issues are the most challenging and most common for customers.
- Product analytics - we track how users move through the system, which helps us understand how existing features are being used.
- Product strategy - our long-term strategic vision for the products.
Custom applications
216 results found
-
Include other data signals with the Status API
When using export data, it is possible to get other datasignals during the time of a status, for example the exact windspeed, nacelle direction etc. at the moment of a status.
This is not yet possible with API using the Status endpoint. Could this be made possible?
5 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
exclude specific status from grouping
The ability to exclude specific status messages from grouping. We have a specific status that stops the turbine, but is not the main reason if the turbine after that does not automatically start. It should be the next status as the main status. Therefore we would like the option that for a specific status, you can select to not group this status.
21 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Allow reporting in Site time, not only in Company time as is the case at the moment
We suggest to open up the possibility to create reports in site time. Financial reporting is typically done in site time and therefore the current setup in Greenbyte generates a sync issue if the wind farm is located in another timezone than company time.
11 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Make it possible to indicate a Task or HSE Event in the Plan section is "IN PROGRESS"
Currently, tasks and HSE events in Greenbyte can only be designated as "Unresolved" or "Resolved". Being able to indicate that a task is in progress would make it possible to monitor how quickly action is being taken and ultimately closed out.
1 voteThanks for your feedback, this is a great request. It's open for voting from other users.
-
HSE incident status option in the HSE table widget
We need the possibility to list only HSE cases of a certain status (resolved - unresolved) in the report HSE table widget. Currently it is not possible to have a table in the reports listing only the open = "unresolved" HSE cases.
2 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Expand Button - entire system
This is a nice feature that should be in the entire system, specially for monitoring dashboards (not obvious which event is active during that moment) and data studio, otherwise you have to go to event log or status categorization to check them.
3 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Possibility to include curtailments to time-based availability calculations
Would it possible to add a feature that in the time-based availability calculations we would be able to include curtailments in the calculations. Meaning that if a turbine is curtailed to 50% during an hour, the turbine will have availability of 50% during that hour. I assume that this is not anyhow possible at the moment?
14 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Middle voltage loss calculation (Energy Export vs. Energy Meter) in MWh or %
When metering systems are connected to the Scada one standardized tech. KPI is to understand the middle voltage losses between WTGs and official energy metering.
Ideally such should be calculated on kWh/MWh basis as simple delta between Sum of Energy Export (WTGs) and official Metering. Additionally the % deviation should be calculated, too.Further benefits:
As Greenbyte introduced the Loss Waterfall also this calculation would benefit from the above as additional losses (depending the size of the wind farm typically 0.5 - 2.x %) could be highlighted. Additional precision for the Loss Waterfall Diagram!3 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Issue: "General site" pre-selected when creating task during log on process
When creating a new task during the log on process "General Site" is (hiddenly) pre-selected and not the specific turbine(s) directly. That should be changed.
11 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Set up rules for automatic data export and forwarding by mail
Use case: I have to send twice a week 3-4 days of operational data of a certain set of WTGs to the client. Would be amazing to be able to implement a rule that runs the job in the background: data is downloaded and forwarded to an email address automatically.
8 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Trainee Personnel qualification
Is it possible to add a "Trainee" section under personnel qualifications? There are many technicians who do not have any qualifications yet and it would be advantageous for OCC etc... to be confident on the status of the technician and know to not allow them to take control of a turbine and that only site access is allowed.
3 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
conditional powercurve
For conditional power curves it would be nice to have the following options:
1. copy the default values to conditonal power curve for editing, that saves time entering the values manually.
2. it would be nice to add a condition: to be able to give a start date + time and end date + time. Currently if curtailment starts at 10:00 at day 1 and ends at 16:00 at day 5 it requires you to manually enter the conditional power curve 3 times!4 votesThanks for your feedback, this is a great request. It's open for voting from other users. -
Need a new qualification added on Breeze
Is it possible to add ‘Competent Person (CP)’ in the dropdown box on Breeze when adding in a qualification after completion of a site induction.
A CP has more limitations on the tasks they can carry out on the HV/LV system than AP and SAP. A CP id not the same as a CT.
12 votesThanks for your feedback, this is a great request. It's open for voting from other users. -
Create a specific degradation factor for the first year
The solar panels manufacturers commonly warranty a different degradation factor for the first year than for the following ones (see example attached: a 3% degradation is expected for the first year, then a 0.706% factor for year 2 to 25).
Could you create a separate degradation factor for the first year of operations?2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Order by device number not Power
Have the option to when hovering over a data table the data displayed is in the device number order, not highest value (power, current)
e.g. when looking power produced by each Inverter module for inverter 1 be ordered 1.1, 1.2, 1.3, 1.4 etc not in the order in which they are producing the most power
2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Make Analyse URL links include the filtering
Make the Analyse links include the filtering. For example if I select the time period to be 2021 I'd like the link shared to also be filtered for 2021
2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Make the URL links human readable
Make the URL links human readable, so that I can alter them to adjust the outputs, e.g. for example if I wanted to create a link outside of Greenbyte to refer to show something within Greenbyte
2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Tracker availability from statuses
Today, the tracker availability is only calculated via the deviation of angles. We would need to also have it calculated following (stop) statuses.
1 voteThanks for your feedback, this is a great request. It’s open for voting from other users.
-
PR at meter level based on IEC
In solar, calculate the performance ratio at meter level based on the IEC standard definition.
1 voteThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Hide "Devices (opt)" during site access at sites with selected WTSR rules
For sites with selected WTSR rules, the option to choose a device during site access should be hidden. Selecting a device should only be possible at the next step by choosing qualified personell.
5 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
- Don't see your idea?