Greenbyte Ideas
Our approach to product feedback
The benefits of giving us your product feedback
What happens to your product feedback
How we choose what to implement
- Customer feedback - there are many ways we listen for your feedback:formal customer interviews and other research activitiesevents like conferences and trade showscomments and votes on issues here in Greenbyte & BluePoint Influence
- CSM team insights - our CSM team knows which issues are the most challenging and most common for customers.
- Product analytics - we track how users move through the system, which helps us understand how existing features are being used.
- Product strategy - our long-term strategic vision for the products.
Custom applications
272 results found
-
Site time should match SCADA time during summer months (not just in winter!)
In summer when Australia/Melbourne shifts to Australian Eastern Daylight Time (AEDT = UTC+11) 'Site time' does not match the Vestas wind turbines which always follow Australian Eastern Standard Time (AEST = UTC+10). It would be preferable for the Site time to always match the SCADA data. Thanks!
5 votes -
HSE incident status option in the HSE table widget
We need the possibility to list only HSE cases of a certain status (resolved - unresolved) in the report HSE table widget. Currently it is not possible to have a table in the reports listing only the open = "unresolved" HSE cases.
2 votesThanks for your feedback, this is a great request. It's open for voting from other users.
-
Defining alerts based on status or warnings that have no duration
In some cases, status or warning have no duration, but inform about the beginning or the end of curtailment, for instance.
It would be useful if alerts could be set up by a status/warning code indicating the beginning of some event, and another status/warning code indicating it ended.4 votes -
Get notification for an overdue in the Plan section
In the Plan section suggest to get a notification if someone goes beyond the working end time.
1 vote -
add/copy downtime to multiple days
At the moment you can add several turbines/assets to a specific downtime but it would be great to also be able to copy or apply a specific planned downtime on multiple days when you have several downtimes with the same time but at different dates. e.g add a planned downtime for 8 hours on monday 08:00 to 16:00 and then be able to copy this and apply also on tuesday or several days.
4 votes -
Hide "Devices (opt)" during site access at sites with selected WTSR rules
For sites with selected WTSR rules, the option to choose a device during site access should be hidden. Selecting a device should only be possible at the next step by choosing qualified personell.
5 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Make it possible to indicate a Task or HSE Event in the Plan section is "IN PROGRESS"
Currently, tasks and HSE events in Greenbyte can only be designated as "Unresolved" or "Resolved". Being able to indicate that a task is in progress would make it possible to monitor how quickly action is being taken and ultimately closed out.
1 voteThanks for your feedback, this is a great request. It's open for voting from other users.
-
Qualifications under Personell
Hello, Is it possible to add more qualifications under personell?
If i would like to see following:
GWO
Medical
Hotwork permitAlso if possible to add a date for:
Issued date:
Expire date:Thanks
5 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Make it possible to upload the Default Power Reduction Mode Allocation List from Vestas to manage curtailments
Vestas turbines with PPC uses Power Derete Internal codes that in Greenbyte is called Curtailment mode signals. These signal indicate a curtailment event that could have direct impact on the contracual availibility depending on how they are categorized. What the signals indicate and how they should be catecorized are listed in the Default Power Reduction Mode Allocation List.
The only way to get the Greenbyte system to take this signals into account in the contractual availibity right now is to create an alert and link that alert to one of your curtailment satuses. It not very optimal (with a growing…
5 votes -
Production losses are calculated towards to Warning events
Would be possible chance configuration so that losses are not calculated toward to warning event? It looks little bit strange in monthly report if losses are calculated toward to warning (this is not root cause for losses). This is not good function in some old wind farms where are all time active warnings. This feature would be individually changed in every wind farm if somebody want that losses are calculated toward to warning.
I would like suggest next: In Breeze, there is general information code (blue) some is generated automatically by Breeze when next conditions are filled.
- Now active stop-code
- …
4 votes -
Add Show/Hide Toggle to HSE Observations
Add a 'show/hide' toggle to the 'Add Incident' window in the Plan - HSE section. This would make visible or hide the particular incident in the Site/Device access windows.
The reason this is necessary is the Site/Device access windows do not display large volumes of HSE observations very well. The option to hide non critical observations will assist Operational Controllers to relay critical HSE observations to technicians, without having to scroll through an excessively long list. The toggle should default to visible, which will maintain the current functionality for other users.13 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Show number of files for a task
Get the document symbol for the number of files/documents uploaded in a task, so you can get a good overview of what tasks have documents uploaded (i.e Boroscopy reports) without having a separate tracker.
2 votes -
Status changes trazability via API
when it comes to refreshing a status database via API, it is quite challenging to update manual changes in the status (i.e, category changes, group structure change, manually added stops that change the group structure,,,)
Would be great to have in the API some way to trace those changes. For example, "last modified" point in the API would already help. It would also be nice to know if the event was added manually, see image.
4 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Display availability in status log
It would be great if, in the status log (the one in data studio), one would be able to see how much one stop/status affects the availability for that turbine during the given month or period.
This would significantly facilitate the process of comparing the data in Greenbyte to that of the service provider.
4 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Connecting alerts to tasks (acknowledging and commenting)
For monitoring purposes it would be of great benefit to be able to ackonowledge and connect alerts with corresponding tasks. Alerts can come and disappear with a different scheme than statuses if the conditions are met. This would make it possible to have task comments appear at the status codes and the corresponding alerts at the same time. This would increase the overview about situations we want to be aware of.
18 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Create a specific degradation factor for the first year
The solar panels manufacturers commonly warranty a different degradation factor for the first year than for the following ones (see example attached: a 3% degradation is expected for the first year, then a 0.706% factor for year 2 to 25).
Could you create a separate degradation factor for the first year of operations?2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
HSE Filter by Device
I would like functionality to filter HSE notes by device as well as site.
11 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
"Service this year" signal to count contractual year an not calendar year
The signal "service this year", coming from the "maintenance" toggle on availability contracts, currently considers a calendar year. To make it coherent with the availability contract, it should consider the "contractual year" instead.
3 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Order by device number not Power
Have the option to when hovering over a data table the data displayed is in the device number order, not highest value (power, current)
e.g. when looking power produced by each Inverter module for inverter 1 be ordered 1.1, 1.2, 1.3, 1.4 etc not in the order in which they are producing the most power
2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.
-
Make Analyse URL links include the filtering
Make the Analyse links include the filtering. For example if I select the time period to be 2021 I'd like the link shared to also be filtered for 2021
2 votesThanks for your feedback, this is a great request. It’s open for voting from other users.